top of page
logo white.png

Gateway Campus

COMING 2028 • DAVIDSON, NORTH CAROLINA

Screenshot 2026-10-05 112806.png

The new national headquarters of Haversack and research laboratory for Davidson Day School, designed with the community in mind.

58,000

SQUARE FEET

4

STORIES

2028

OPENING

Architectural rendering • ODA Architecture

THE STORY

Davidson is Home.

Gateway Campus will be the national headquarters of Haversack, a veteran-owned logistics company providing engineered, in-source solutions for private equity firms and mid-market manufacturers. Haversack is excited to announce the construction of their permanent home in the town they chose for its people and sense of community.

Screenshot 2026-10-05 112823.png

View along Griffith Street • site design by Bolton & Menk

IN PARTNERSHIP WITH

Davidson Day School

A campus built for learning.

Three floors of Gateway Campus are dedicated to Davidson Day School - STEM labs, collaboration spaces, a dining commons, and research and design programs. A new home for science, technology, engineering, math, medicine, and more.

STEM Labs

Diploma Distinctions

Research + Design

Collaborative Spaces

Dining Commons

Outdoor Learning

SUPPORTED BY GATEWAY CAMPUS

01

Think Deeply

Inquiry, research, critical thinking, and intellectual risk-taking.

02

Create & Collaborate

Experimentation, teamwork, design, and problem-solving.

03

Connect to the Real World

Real-world, interdisciplinary study beyond the classroom.

Haversack_Logo_2024.png
Davidson Day logo.png

04

Turn Ideas into Action

Skills that evolve with emerging fields, technologies, and futures.

INSIDE THE BUILDING

Built to be Shared.

The first floor and grounds are designed with the town of Davidson in mind.

01

Event Space

6,000-7,000 sq ft of programmable space for gatherings, celebrations, and community events.

02

Food Hall

First-floor kitchen spaces built around a food-hall and open-market concept, with room for local vendors.

03

Patio & Amphitheatre

An 8,850 sq ft patio and natural amphitheatre, wired for food trucks, performances, and outdoor events.

04

Bike Parking

20 covered bicycle spaces for Davidson's bike-friendly streets.

THE ROAD AHEAD

Ground breaks soon.

LATE 2026

2028

Groundbreaking

Doors open

Targeted dates per the Town of Davidson development review. Renderings are subject to change as design progresses.

Learn More

News of Davidson sat down with Chris Nadeau to talk about the project and why Davidson.

logo white.png

VETERAN-OWNED & OPERATED

© 2026 Haversack • 131 Davidson Gateway Drive, Davidson, NC

bottom of page